首页>
外国专利>
PILE PRESS-IN CONSTRUCTION METHOD AND MEMBER FOR PUSHING UNDERGROUND OBSTACLE ASIDE
PILE PRESS-IN CONSTRUCTION METHOD AND MEMBER FOR PUSHING UNDERGROUND OBSTACLE ASIDE
展开▼
机译:推入地下障碍物的桩压入施工方法及构件
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To enable press-in of a pile by efficiently pushing an underground obstacle aside without reference to the size or hardness of the underground obstacle such as a stone.;SOLUTION: A member 3 for pushing an underground obstacle aside, which has a polygonal pyramid-shaped part 4 provided at a leading end of a polygonal column-shaped part 5, is pushed into the underground obstacle while being rotated or swung, and a space for allowing entry of a pile 2 is formed by drawing the underground obstacle near a periphery by the polygonal pyramid-shaped part 4 at the leading end and the polygonal column-shaped part 5 continuing therefrom. Thus, the pipe 2 is pressed into the space.;COPYRIGHT: (C)2012,JPO&INPIT
展开▼