首页> 外国专利> The place where bulkhead manufacture of the rivers and the like is installed and the fixed weir and its bulkhead structure in order to prevent the erosion and the like which is generated at the place where bulkhead manufacture is not installed

The place where bulkhead manufacture of the rivers and the like is installed and the fixed weir and its bulkhead structure in order to prevent the erosion and the like which is generated at the place where bulkhead manufacture is not installed

机译:为了防止在未设置舱壁的地方产生的腐蚀等,安装有河流等舱壁的安装场所和固定堰及其舱壁结构。

摘要

Topic The place where bulkhead manufacture of the rivers and the like is installed and the bulkhead structure which prevents the erosion and the like which is generated with boundary of the place where bulkhead manufacture is not installed is offered.SolutionsIn the place where it is far from the concrete block 3 which is most Kawasita in the string of bulkhead manufacture position on central side of the river, Kawahata side being rectilinear, central site of the river installs the fixed weir 8 of curved line form. Between bulkhead manufacture and fixed weir 8 the velocity of flow which flows the fixed weir width of outflow section 10 of Kawasita side between 8 which produces the velocity of flow difference of the velocity of flow which flows from curved line form and bulkhead manufacture and width and bulkhead manufacture and the fixed weir of the inflow section of the Kawakami side which is between the fixed weirs is adjusted and velocity of flow is changed by the fact that it locks. Because of this, digging the curved line side of the fixed weir, it becomes quicker and than the velocity of flow which flows the place where bulkhead manufacture is installed and it prevents the erosion and the like which is generated between the place where bulkhead manufacture is not installed. Choice figure Drawing 2
机译:<主题>提供设置有河流等的隔板制造的场所以及防止在没有隔板的制造场所的边界产生的腐蚀等的隔板构造。在河中央侧的隔壁制造位置的串中,距最靠近川西的混凝土砌块3远,川hat侧为直线​​,河中央部位设置有曲线状的固定堰8。在隔板制造和固定堰8之间,流过川崎侧流出段10的固定堰宽度的流速在8之间,该流速产生从曲线形式和隔板制造流出的流速的流速差和宽度,以及隔板的制造和位于固定堰之间的川上侧入流段的固定堰被调节,并且由于其锁定而改变了流速。因此,挖掘固定堰的曲线侧比流过安装隔板的地方的流速更快,并且防止了在隔板制造的地方之间产生的腐蚀等。未安装。<选择图>图2

著录项

  • 公开/公告号JP3178462U

    专利类型

  • 公开/公告日2012-09-20

    原文格式PDF

  • 申请/专利权人 佐々木 学;

    申请/专利号JP20120001761U

  • 发明设计人 佐々木 学;佐々木 繁;

    申请日2012-03-10

  • 分类号E02B3/02;

  • 国家 JP

  • 入库时间 2022-08-21 17:42:27

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号