首页> 外国专利> Earthquake at the time of earthquake of the elevator which to do

Earthquake at the time of earthquake of the elevator which to do

机译:要做的电梯的地震时的地震

摘要

PROBLEM TO BE SOLVED: To provide an earthquake time control operation device of an elevator for minimizing earthquake damage after stopping, by arranging a standby mode provided up to an arrival of an earthquake to the elevator stopped by control operation.;SOLUTION: This earthquake time control operation device performs the control operation in response to its arrival time, by predicting the arrival time of the earthquake, by using real-time earthquake information by an earthquake wave, and is provided with an earthquake standby operation control part 22 for performing earthquake standby operation for restraining the earthquake damage to the elevator stopped by the control operation by using the real-time earthquake information.;COPYRIGHT: (C)2008,JPO&INPIT
机译:要解决的问题:提供一种电梯的地震时间控制操作装置,其通过将直到地震到达由控制操作停止的电梯到达的电梯布置成待机状态,来使停止后的地震损害最小化。控制操作装置通过利用地震波的实时地震信息通过预测地震的到达时间来响应于其到达时间来执行控制操作,并且设有用于进行地震待机的地震待机操作控制部22。通过使用实时地震信息来抑制由于控制操作而停止的电梯对地震的破坏的操作。版权所有:(C)2008,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号