GUIDE MEMBER FOR VERTICAL PIPE CONSTRUCTION AND VERTICAL PIPE CONSTRUCTION METHOD
GUIDE MEMBER FOR VERTICAL PIPE CONSTRUCTION AND VERTICAL PIPE CONSTRUCTION METHOD
展开▼
机译:竖管施工的指导成员和竖管施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To prevent the upper end of a pipe material moved up in a building from abutting on a slab when constructing a vertical pipe by joining a plurality of pipe materials in series.;SOLUTION: When constructing a vertical pipe 50 by joining two or more pipe materials 1 in series in a building 51 with a plurality of stories, a guide member 10 is mounted on the upper end of the pipe material 1, the pipe material 1 is lifted up by a wire 3 (4) hung from an upper layer, and the lifted pipe material 1 is fixed to the building 51. Then, the guide member 10 is mounted on the upper end of a next pipe material 1, the next pipe material 1 is lifted up by the wire 3 (4) hung through the inside of the pipe material 1 fixed to the building 51, the upper end of the next pipe material 1 is joined to the lower end of the pipe material 1 fixed to the building 51, and the next pipe material 1 is fixed to the building 51. Thereafter, two or more pipe materials 1 are likewise joined in series to construct the vertical pipe 50.;COPYRIGHT: (C)2012,JPO&INPIT
展开▼