The top and bottom direction intermediate section of two terraced projection finishing blow

机译:上下两个梯形投影的中间部分精加工吹

摘要

PROBLEM TO BE SOLVED: To provide a two-step earth retaining wall which enables the shortening of a construction period and reduction in cost by enabling the smooth progress of excavation work because timbering such as a ground anchor is not required during the internal excavation of an inside earth retaining wall, and a construction method for the two-step earth retaining wall.;SOLUTION: In this two-step earth retaining wall, a connecting material 4 makes an outside earth retaining wall 1 connected to the upper end of the inside earth retaining wall 2 which is constructed via a stepped excavation section 3 inside the outside earth retaining wall 1. The internal ground of the outside earth retaining wall 1 is excavated up to an upper-end level of the inside earth retaining wall 2, and a vertical intermediate section of the outside earth retaining wall 1 and the upper end of the inside earth retaining wall 2 are connected to each other by means of the connecting material 4. After that, the internal ground of the inside earth retaining wall 2 is excavated for the construction of the two-step earth retaining wall.;COPYRIGHT: (C)2007,JPO&INPIT
机译:要解决的问题:提供一种两步式挡土墙,通过使开挖工作顺利进行,从而缩短了施工周期并降低了成本,因为在进行内部开挖时不需要使用诸如地锚之类的木材。内部挡土墙和两步式挡土墙的施工方法;解决方案:在此两步式挡土墙中,连接材料4使得外部挡土墙1连接到内部挡土墙的上端外部挡土墙1的内部通过阶梯状的开挖部3而构成。外部挡土墙1的内部地面被挖掘至内部挡土墙2的上端水平,并垂直外部土体挡土墙1的中间部分和内部土体挡土墙2的上端通过连接材料4相互连接。挖掘内部挡土墙2的内部地面以建造两步挡土墙。版权所有:(C)2007,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号