首页>
外国专利>
While installing the cylindrical casing in earth finishing blow construction method, and the excavation component null earth
While installing the cylindrical casing in earth finishing blow construction method, and the excavation component null earth
展开▼
机译:以土方吹塑施工法安装圆筒形套管时,开挖成分为零土
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide an earth retaining method efficiently installing an earth retaining member even in a hard ground, and preventing a ground from being settled owing to the vertical installation of the earth retaining member.;SOLUTION: In this earth retaining method, a cylindrical casing 11 is attached to an earth retaining member 15, the earth retaining member 15 is vertically installed in the ground while carrying out excavation by an excavating member 10 having a spiral blade 13, and an excavating tool 10 and the casing 11 are pulled up to the ground while reversely rotating the excavating tool 10. When the earth is excavated by the excavating member 10, or when the excavating tool 10 is pulled up, a filler is injected into the ground.;COPYRIGHT: (C)2009,JPO&INPIT
展开▼