首页>
外国专利>
Being the project planned manner where project planned manner, the project plan program
Being the project planned manner where project planned manner, the project plan program
展开▼
机译:作为项目计划方式,在项目计划方式中,项目计划程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To accurately estimate the work time of each work in a workflow when planning a project for executing the workflow.;SOLUTION: A computer substitutes an input numerical value of a work difficulty level determination attribute for a prescribed work difficulty level determination function to calculate a work difficulty level with respect to a corresponding work and substitutes an input numerical value of a skill level determination attribute for a prescribed skill level determination function with respect to skill of corresponding resources and calculates an estimate work time resulting from correcting a standard work time assigned to the work, by calculation using a work difficulty level correction value corresponding to the calculated work difficulty level and a skill level correction value corresponding to the calculated skill level with respect to the standard work time.;COPYRIGHT: (C)2009,JPO&INPIT
展开▼