首页> 外国专利> PROJECT PLANNING METHOD, PROJECT PLANNING PROGRAM, AND PROJECT PLANNING SYSTEM

PROJECT PLANNING METHOD, PROJECT PLANNING PROGRAM, AND PROJECT PLANNING SYSTEM

机译:项目计划方法,项目计划程序和项目计划系统

摘要

PROBLEM TO BE SOLVED: To accurately estimate the work time of each work in a workflow when planning a project for executing the workflow.;SOLUTION: A computer substitutes an input numerical value of a work difficulty level determination attribute for a prescribed work difficulty level determination function to calculate a work difficulty level with respect to a corresponding work and substitutes an input numerical value of a skill level determination attribute for a prescribed skill level determination function with respect to skill of corresponding resources and calculates an estimate work time resulting from correcting a standard work time assigned to the work, by calculation using a work difficulty level correction value corresponding to the calculated work difficulty level and a skill level correction value corresponding to the calculated skill level with respect to the standard work time.;COPYRIGHT: (C)2009,JPO&INPIT
机译:解决的问题:在计划执行工作流程的项目时,要准确估计工作流程中每个工作的工作时间;解决方案:计算机将工作难度等级确定属性的输入数值替换为规定的工作难度等级确定函数用于计算相对于相应工作的工作难度等级,并将技能水平确定属性的输入数值替换为相对于相应资源的技能的规定技能水平确定功能,并计算通过校正标准而得出的估计工作时间相对于标准工作时间,通过使用与计算出的工作难度等级相对应的工作难度等级校正值和与计算出的技能等级相对应的技能等级校正值进行计算,分配给该工作的工作时间。版权所有:(C)2009 ,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号