首页> 外国专利> OVERHEAD POWER LINE AND CONSTRUCTION METHOD OF SURROUNDING OF IRON TOWER

OVERHEAD POWER LINE AND CONSTRUCTION METHOD OF SURROUNDING OF IRON TOWER

机译:铁塔架空架空线及围护施工方法

摘要

PROBLEM TO BE SOLVED: To provide overhead power lines and a construction method of the surroundings of an iron tower excellent in lighter work, and simplification in construction, and at low costs.;SOLUTION: In the overhead power lines that an iron tower side end of the overhead power line 31 arranged on both sides of the iron tower 11 is supported by the iron tower 11, respectively via an insulator 30, it includes: a support unit 50 which connects an interval between the insulator 30 and the overhead power line 31 at a position separated from the iron tower 11, supports the overhead power line 31 on the side of being separated from the iron tower 11 than the part at a tension state, and has a temporary insulator 17; and a jumper unit 60 having a cable 4 with metal insulation which is arranged on both sides of the iron tower 11, supported at the tension state, respectively, by the support unit 50, and electrically connects the interval of the overhead power line 31 at a state that stage peeling work is performed to its terminal connection part 25.;COPYRIGHT: (C)2012,JPO&INPIT
机译:要解决的问题:提供一种架空电力线和一种铁塔周围环境的施工方法,该架铁工作轻巧,简化,成本低廉。解决方案:在架空电力线中,铁塔侧端设置在铁塔11的两侧的架空电力线31中的一个由铁塔11分别经由绝缘体30支撑,其包括:支撑单元50,其连接绝缘体30和架空电力线31之间的间隔。在与铁塔11分离的位置处,架空电力线31在与铁塔11分离的一侧比受拉状态的部分支撑高架电力线31,并具有临时绝缘体17。跳线单元60,其具有金属绝缘的电缆4,其布置在铁塔11的两侧,分别由支撑单元50以张紧状态支撑,并且将架空电力线31的间隔电连接至对其端子连接部分25进行阶段剥离工作的状态。版权所有:(C)2012,JPO&INPIT

著录项

  • 公开/公告号JP2012005263A

    专利类型

  • 公开/公告日2012-01-05

    原文格式PDF

  • 申请/专利权人 HITACHI CABLE LTD;

    申请/专利号JP20100138622

  • 申请日2010-06-17

  • 分类号H02G1/02;

  • 国家 JP

  • 入库时间 2022-08-21 17:37:18

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号