首页> 外国专利> In order to penetrate completely the revised field which should do

In order to penetrate completely the revised field which should do

机译:为了完全渗透应该做的修改领域

摘要

PROBLEM TO BE SOLVED: To provide a ground improvement method and a ground improvement device which can effectively discharge excess muddy water easily and at low cost.;SOLUTION: The ground improvement method comprises the first process of arranging a mud-discharge pipe 10 in the ground G to penetrate an improvement area A of which the ground is to be improved, the second process of connecting a supply pipe 30 used for supplying a conditioning material C to the improvement area A to one end of the mud-discharge pipe 10 and the third process of spraying the conditioning material C at high pressure onto the improvement area A through the medium of the supply pipe 30 while drawing the supply pipe 30 into the ground G by drawing the mud-discharge pipe 10 from the other end. The excess muddy water generated with the high-pressure spraying of the conditioning material C is taken into the mud-discharge pipe 10, and is discharged from the other end of the mud-discharge pipe 10. The ground improvement device using the above method is also disclosed.;COPYRIGHT: (C)2008,JPO&INPIT
机译:解决的问题:提供一种能够容易且低成本地有效地排出多余的浑水的地面改良方法和地面改良装置。解决方案:地面改良方法包括将排泥管10布置在地面中的第一步骤。第二步骤是将用于将调节材料C供应到改善区域A的供应管30连接到排泥管10的一端,第二步骤是将用于将调节材料C供应到改善区域A的供应管30连接到第二步骤。第三过程是通过从另一端抽出排泥管10,通过供给管30的介质将高压调节材料C高压地通过供给管30的介质喷涂到改善区域A上。通过高压喷射调节材料C而产生的多余的浑水被吸入排泥管10,并从排泥管10的另一端排出。使用上述方法的地面改良装置为: COPYRIGHT:(C)2008,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号