Being the earth finishing blow wall which consists of the parent post side lagging in order to prevent the dead water structure of the earth finishing blow wall which consists of the parent post side lagging and the earth finishing blow wall which consists of the parent post side lagging, and the construction manner of the earth finishing blow wall which consists of the parent post side lagging
Being the earth finishing blow wall which consists of the parent post side lagging in order to prevent the dead water structure of the earth finishing blow wall which consists of the parent post side lagging and the earth finishing blow wall which consists of the parent post side lagging, and the construction manner of the earth finishing blow wall which consists of the parent post side lagging
PROBLEM TO BE SOLVED: To provide an earth retaining wall composed of horizontal sheathing with a soldier beam, which prevents the protrusion of groundwater and the outflow of sediment in the construction of the earth retaining wall, and which can be easily removed after the construction; and to provide a construction method for the earth retaining wall.;SOLUTION: The horizontal sheathing 1 with the soldier beams comprises the soldier beams 2 which are to be driven at predetermined intervals into ground 10, horizontal sheathing 3 which is installed between the soldier beams 2, and cut-off sections 4 which are formed only in positions to block off the flow of the groundwater in aquifers 6 and 8 of the ground 10, respectively.;COPYRIGHT: (C)2009,JPO&INPIT
展开▼