首页> 外国专利> Cast-in-place concrete steel pipe pile and its construction methods

Cast-in-place concrete steel pipe pile and its construction methods

机译:现浇混凝土钢管桩及其施工方法

摘要

PROBLEM TO BE SOLVED: To provide a cast-in-place steel pipe concrete pile and its construction method forming a final mutual joint part of steel pipes as a joint part equivalent to full strength joining with no risk of loosening the surrounding ground with a small amount of projection to the outside of a steel pipe in pile construction.;SOLUTION: In the cast-in-place steel pipe concrete pile 1 and its construction method, a plurality of joining splice plates 11 circumferentially divided over the inside of upper and lower steel pipes 2 are arranged at the mutual joint part of the steel pipes in a cast-in-place pile with its lower part formed in reinforced concrete structure and with its upper part formed in steel pipe concrete structure covered with a plurality of steel pipes arranged in series. The steel pipes 2 are fastened and joined to the respective splice plates 11 by high strength bolts 14 penetrating bolt holes provided beforehand in the steel pipes 2. The upper part of a long-sized reinforcing cage 4 is disposed inside the lower part of the steel pipe, and a short-sized reinforcing cage 5 is disposed embedded over a predetermined length in a vertical direction inside the joint part of the upper and lower steel pipes 2 to reinforce the steel pipe joint part to have predetermined yield strength.;COPYRIGHT: (C)2008,JPO&INPIT
机译:解决的问题:提供一种现场浇铸的钢管混凝土桩及其形成方法,该钢管混凝土桩形成钢管的最终相互连接部分,作为与全强度连接等效的连接部分,而不会有很小的松动周围地面的风险。解决方案:在现浇钢管混凝土桩1及其施工方法中,在上下两个内侧沿周向划分多个接合板11钢管2在钢管的相互结合部分处以现浇桩的形式布置,其下部形成为钢筋混凝土结构,并且其上部形成为钢管混凝土结构,并覆盖有多个钢管。系列。钢管2通过穿透预先设置在钢管2中的螺栓孔的高强度螺栓14而紧固并接合到各个接头板11。长尺寸的钢筋笼4的上部布置在钢的下部内部。钢管,在上下钢管2的接合部的内部沿铅垂方向以规定的长度埋设有短尺寸的加强笼5,以使钢管的接合部具有规定的屈服强度。 C)2008,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号