首页> 外国专利> Method And System For Determining The Capacity Required To Complete Work During Planned Start And Finished Times

Method And System For Determining The Capacity Required To Complete Work During Planned Start And Finished Times

机译:确定计划的开始和结束时间完成工作所需的能力的方法和系统

摘要

In one aspect, the present invention is directed to a method for determining the capacity required to complete work during planned start and finished times. The first step entails providing a plurality of Resource Group Names, wherein each Resource Group Name (RGN) represents a particular Work Center (WC) having predetermined resources associated therewith. The predetermined resources include equipment, operators, set-up person(s), fixtures and tooling. The method further includes the steps of selecting a particular item that is in a predefined process flow, providing data that represents a planned movement of the selected item along the predefined process flow, identifying all process steps in the predefined process flow through which the selected item must pass, identifying each Reporting Point (RP) in each selected item's predefined process flow, retrieving data that represents the Required Work Content (RWC) of the selected item at each process step along the predefined process flow, determining the Required Work Content (RWC) to completely perform all process steps in the overall process, providing, for each step of the predefined process flow, an amount of Allocated Time Buffer (ATB) required to accommodate variability associated with completing the Required Work Content (RWC), establishing for each process step and Reporting Point (RP), using the designated Resource Group Name (RGN) representing the Work Center (WC), a Daily Work Calendar (DWC) which is used for assigning Required Work Content (RWC) and Allocated Time Buffer (ATB), retrieving a document start date-time and a document finish date-time for each selected item that enters the predefined process flow, utilizing the Resource Group Name (RGN) representing the Work Center (WC) and the corresponding Work Center (WC) Daily Work Calendar (DWC), Required Work Content (RWC), Allocated Time Buffers (ATB) and document start or finish date-time to establish the planned start date-time and planned finish date-time at each process step in each item's open document's, and utilizing the resources in the Resource Group Name (RGN) representing the Work Center (WC) and the corresponding Work Center (WC) Daily Work Calendar (DWC) to map resource loading at each process step within each open document in accordance with the established planned start date-time and planned finish date-time at each process step to identify any local Allocated Time Buffer (ATB) overloads corresponding to any of the Work Centers (WC) and the resources associated therewith to determine additional capacity requirements.
机译:一方面,本发明针对一种用于确定在计划的开始时间和结束时间期间完成工作所需的能力的方法。第一步需要提供多个资源组名称,其中每个资源组名称(RGN)代表具有预定资源与其关联的特定工作中心(WC)。预定资源包括设备,操作员,设置人员,固定装置和工具。该方法还包括以下步骤:选择预定义过程流中的特定项目;提供表示所选项目沿预定义过程流的计划移动的数据;识别预定义过程流中的所有过程步骤,通过该过程选择项目必须通过,标识每个选定项目的预定义流程中的每个报告点(RP),在预定义流程中的每个流程步骤中检索表示所选项目的所需工作内容(RWC)的数据,确定所需工作内容(RWC) )完全执行整个流程中的所有流程步骤,为预定义流程的每个步骤提供一定数量的已分配时间缓冲区(ATB),以容纳与完成所需工作内容(RWC)相关的可变性,为每个流程步骤和报告点(RP),使用代表工作中心(WC)的指定资源组名称(RGN),每日工作rk日历(DWC),用于分配所需的工作内容(RWC)和已分配的时间缓冲区(ATB),检索进入预定义流程的每个选定项目的文档开始日期时间和文档完成日期时间,代表工作中心(WC)和相应工作中心(WC)的日常工作日历(DWC)的资源组名称(RGN),所需工作内容(RWC),分配的时间缓冲区(ATB)以及文档开始或结束日期时间在每个项目的打开文档的每个处理步骤中建立计划的开始日期时间和计划的结束日期时间,并利用代表工作中心(WC)和相应工作中心(WC)的资源组名称(RGN)中的资源)每日工作日历(DWC),用于根据每个流程步骤中已建立的计划开始日期时间和计划完成日期时间,在每个打开的文档中的每个流程步骤中映射资源负载,以标识任何本地分配的时间缓冲区(ATB)重载对应于任何工作中心(WC)以及与之相关的资源,以确定其他能力要求。

著录项

  • 公开/公告号US2012278123A1

    专利类型

  • 公开/公告日2012-11-01

    原文格式PDF

  • 申请/专利权人 DALE T. HOULE;

    申请/专利号US201013512268

  • 发明设计人 DALE T. HOULE;

    申请日2010-11-29

  • 分类号G06Q10/06;

  • 国家 US

  • 入库时间 2022-08-21 17:33:19