首页> 外国专利> Job scheduling to maximize use of reusable resources and minimize resource deallocation

Job scheduling to maximize use of reusable resources and minimize resource deallocation

机译:作业调度可最大程度地利用可重用资源并最大程度地减少资源分配

摘要

Jobs are scheduled such that resource reuse is maximized and deallocation of reusable resources is minimized. A multi-phase scheduling capability is provided in which during a first phase, weights are assigned to the reusable resources, and during a second phase, the jobs are scheduled. If reusable resources are available for the job, the job is assigned to those resources. Otherwise, a search is performed for a solution which minimizes the weight and number of reusable resources that are to be deallocated.
机译:计划作业,以便最大程度地利用资源,并最大程度地减少可重用资源的重新分配。提供了多阶段调度功能,其中在第一阶段中,将权重分配给可重用资源,在第二阶段中,对作业进行调度。如果作业有可重用资源,则将作业分配给那些资源。否则,将搜索一种解决方案,该解决方案将要释放的可重用资源的重量和数量最小化。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号