首页>
外国专利>
Construction of reinforced Soil and Procedure for the Construction of a work of reinforced Soil
Construction of reinforced Soil and Procedure for the Construction of a work of reinforced Soil
展开▼
机译:加筋土的施工和加筋土的施工程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
The project includes a buffer, a filler at the back of the buffer, a synthetic reinforcement belt distributed during the filling process, and a connection system between the backup belt and the filler belt. The connection system includes the fixation of the continuous closed-circuit form, each of which has the first two parts connected to the buffer zone and alternates with the first several parts in the closed-circuit form, The second part extends to the back of the buffer, where they are redeployed, forming two loops, with at least one backup tape. Requirement 1: construction works,Including: one team (4, 54);A month agoAt the rear, the composite reinforcing strip (2),a. The distributed backfill system, plus the connection system (30, 40, 80, 90) between the reinforcement belt and the backfill belt, is characterized by that the connection system includes fixed devices (30, 80) in the form of continuous closed circuit, each circuit has two withholding parts (30a; 80A);Alternately with the first part of the seal ring form, the two second parts (30b; 80B) extend to the rear buffer, where they are redeployed to form two loops in which there is at least one backup belt (2). Item 2: work in accordance with Item 1, including at least one guidance device (40; 90), two loops (30; 80) consisting of the second part of a fixed device (30b, 808) and an auxiliary belt (2) passing through the two loops,This works in compression in response to enhanced tape traction. Item 4 labor: according to item 3 labor, the ingredient (54) has the form of mesh or fabric, and the first part (80) is fixed around at least one mesh or fabric. Item 5: according to Item 4, in which (54) includes various mesh or tissue elements (54a, 54B),At least one fixed (80) head part (80 a) is placed on at least two adjacent mesh or tissue elements respectively. Labor Law No. 12: procedures for civil engineering of building reinforcement, including: installing a bracket (4; 54) in the former part of the project, and installing a bracket (30; 80) on the bracket, in the form of continuous closed circuit, two parts of each branch head are used for hook up (30A; 80B),And alternate with the front part of the closed loop, the second part (30b; 80B) extends to the rear, and redeploys at the rear to form the loop; connect the composite reinforcement belt (2) with the auxiliary belt, For this purpose, there must be at least one backup tape in the two circles that form the second part of a fixed point; fill in a backup tape after the circle, which is connected to the circle by fixing.
展开▼