首页> 外国专利> Construction of reinforced Soil and Procedure for the Construction of a work of reinforced Soil

Construction of reinforced Soil and Procedure for the Construction of a work of reinforced Soil

机译:加筋土的施工和加筋土的施工程序

摘要

The project includes a buffer, a filler at the back of the buffer, a synthetic reinforcement belt distributed during the filling process, and a connection system between the backup belt and the filler belt. The connection system includes the fixation of the continuous closed-circuit form, each of which has the first two parts connected to the buffer zone and alternates with the first several parts in the closed-circuit form, The second part extends to the back of the buffer, where they are redeployed, forming two loops, with at least one backup tape. Requirement 1: construction works,Including: one team (4, 54);A month agoAt the rear, the composite reinforcing strip (2),a. The distributed backfill system, plus the connection system (30, 40, 80, 90) between the reinforcement belt and the backfill belt, is characterized by that the connection system includes fixed devices (30, 80) in the form of continuous closed circuit, each circuit has two withholding parts (30a; 80A);Alternately with the first part of the seal ring form, the two second parts (30b; 80B) extend to the rear buffer, where they are redeployed to form two loops in which there is at least one backup belt (2). Item 2: work in accordance with Item 1, including at least one guidance device (40; 90), two loops (30; 80) consisting of the second part of a fixed device (30b, 808) and an auxiliary belt (2) passing through the two loops,This works in compression in response to enhanced tape traction. Item 4 labor: according to item 3 labor, the ingredient (54) has the form of mesh or fabric, and the first part (80) is fixed around at least one mesh or fabric. Item 5: according to Item 4, in which (54) includes various mesh or tissue elements (54a, 54B),At least one fixed (80) head part (80 a) is placed on at least two adjacent mesh or tissue elements respectively. Labor Law No. 12: procedures for civil engineering of building reinforcement, including: installing a bracket (4; 54) in the former part of the project, and installing a bracket (30; 80) on the bracket, in the form of continuous closed circuit, two parts of each branch head are used for hook up (30A; 80B),And alternate with the front part of the closed loop, the second part (30b; 80B) extends to the rear, and redeploys at the rear to form the loop; connect the composite reinforcement belt (2) with the auxiliary belt, For this purpose, there must be at least one backup tape in the two circles that form the second part of a fixed point; fill in a backup tape after the circle, which is connected to the circle by fixing.
机译:该项目包括一个缓冲区,缓冲区后面的填充物,在填充过程中分布的合成增强带以及备用带和填充带之间的连接系统。连接系统包括连续闭路形式的固定,每个闭路形式的前两个部分都连接到缓冲区,并与闭路形式的前几个部分交替,第二部分延伸到闭路形式的后面。缓冲区,将它们重新部署,形成两个循环,并至少带有一个备份磁带。要求1:建筑工程,包括:一支队伍(4、54人);一个月前,在后部,复合加强筋(2),a。分布式回填系统以及加固带和回填带之间的连接系统(30、40、80、90),其特征在于,连接系统包括呈连续闭路形式的固定装置(30、80),每个回路具有两个扣压部分(30a; 80A);或者与第一部分的密封圈形式相同,两个第二部分(30b; 80B)延伸至后缓冲器,在此重新部署以形成两个环,其中有两个至少一根备用皮带(2)。项目2:根据项目1的工作,包括至少一个引导装置(40; 90),两个环(30; 80),该环由固定装置(30b,808)的第二部分和辅助皮带(2)组成通过两个循环,在压缩时可响应增强的磁带牵引力。第4项劳动:根据第3项劳动,成分(54)具有网眼或织物的形式,并且第一部分(80)被固定在至少一个网眼或织物上。项目5:根据项目4,其中(54)包括各种网状或组织元件(54a,54B),至少一个固定的(80)头部(80a)分别放置在至少两个相邻的网状或组织元件上。第12号劳工法:建筑加固的土木工程程序,包括:在项目的前部安装支架(4; 54),并在支架上以连续的形式安装支架(30; 80)闭路时,每个分支头的两个部分用于连接(30A; 80B),并与闭环的前部交替,第二部分(30b; 80B)延伸至后部,并在后部重新部署形成循环;将复合加固皮带(2)与辅助皮带相连,为此,在构成固定点第二部分的两个圆圈中必须至少有一个备用胶带;在圆圈之后填充备用胶带,该胶带通过固定连接到圆圈。

著录项

  • 公开/公告号AR081126A1

    专利类型

  • 公开/公告日2012-06-27

    原文格式PDF

  • 申请/专利权人 TERRE ARMEE INTERNATIONALE;

    申请/专利号AR2011P100620

  • 发明设计人

    申请日2011-03-01

  • 分类号E02D29/02;

  • 国家 AR

  • 入库时间 2022-08-21 17:25:36

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号