首页> 外文期刊>Geotextiles and Geomembranes >Post-construction performance of a two-tiered geogrid reinforced soil wall backfilled with soil-rock mixture
【24h】

Post-construction performance of a two-tiered geogrid reinforced soil wall backfilled with soil-rock mixture

机译:土石混合充填的两层土工格栅加筋土墙的施工后性能

获取原文
获取原文并翻译 | 示例
       

摘要

There have been very few studies on the application of soil-rock mixtures as the backfills of geogrid reinforced soil retaining walls with due concern for their long-term performance and safety. In this study, a 17-m high two-tiered reinforced soil wall backfilled with soil-rock mixture was instrumented for its performance under gravity load after construction. The instrumentation continued for 15 months. It is found that soil-rock mixtures with small rock content (<30%) have the potential to be used as the backfill materials of geogrid-reinforced retaining walls, but special attentions should be given to compaction quality, backfill-geogrid interaction, and installation damage to geogrids. Reinforcement slippage is possible because of the large particles, but it was small in this case and ceased to develop nine months after the end of construction. Compressibility difference between reinforced and unreinforced backfill might led to rotation of the upper tier. Using the estimated soil strength, the predictions of reinforcement loads by the FHWA methods were 100% higher than the estimated ones from measured strains.
机译:对于土石混合物作为土工格栅加筋土挡土墙的回填材料的应用,很少有研究,因为它们的长期性能和安全性值得关注。在这项研究中,对一处17米高的两层加筋土墙进行了回填,该土墙回填了土石混合料,以检测其在施工后的重力载荷下的性能。仪器持续进行了15个月。研究发现,岩石含量较小(<30%)的土石混合物有可能被用作土工格栅加筋挡土墙的回填材料,但应特别注意压实质量,回填与土工格栅的相互作用以及安装损坏土工格栅。由于颗粒较大,可能会发生滑移,但这种情况下滑移较小,在施工结束后九个月便停止了滑移。加固和未加固回填之间的可压缩性差异可能会导致上层旋转。使用估计的土壤强度,通过FHWA方法进行的钢筋荷载预测比从测得的应变估算的结果高100%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号