首页> 外国专利> Apeo new track for any width thereof.

Apeo new track for any width thereof.

机译:Apeo的任何宽度的新轨道。

摘要

It begins building two concrete beams (one on each side of the track), 0.30 x 0.30 m. and a height of 0.47 m. head lower than the lower rail. On these, glide iron beams HEB-280 to pass between cross and cross, near the bottom of the rails to each supporting beam in the concrete beams. Lane is subject to the iron girders with a special clip. # To give strength to propping all beams with other side, backed up, which is welded to the first installed will join. # To avoid transverse movements beam to be available great song (lattice) lying on the beams and welded thereto. # to avoid vertical movements two lattices are placed, (one on each side of the road), subject to the U-bolts or welded beams.
机译:它开始建造两根混凝土梁(在轨道的每一侧各一根)0.30 x 0.30 m。高度为0.47 m。头部低于下部导轨。在这些导轨上,滑行铁梁HEB-280在横梁之间和横梁之间通过,靠近铁轨的底部,到达混凝土梁中的每个支撑梁。巷道受制于带有特殊夹子的铁箱梁。 #为了增强所有梁的另一侧支撑的能力,将其备份(焊接到第一个安装的梁)进行连接。 #为避免横梁运动,横梁可用大曲(晶格)躺在横梁上并焊接在横梁上。 #为避免垂直移动,在U型螺栓或焊接梁的作用下,放置了两个格子(在道路的每一侧各一个)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号