It begins building two concrete beams (one on each side of the track), 0.30 x 0.30 m. and a height of 0.47 m. head lower than the lower rail. On these, glide iron beams HEB-280 to pass between cross and cross, near the bottom of the rails to each supporting beam in the concrete beams. Lane is subject to the iron girders with a special clip. # To give strength to propping all beams with other side, backed up, which is welded to the first installed will join. # To avoid transverse movements beam to be available great song (lattice) lying on the beams and welded thereto. # to avoid vertical movements two lattices are placed, (one on each side of the road), subject to the U-bolts or welded beams.