首页>
外国专利>
OPERATION PLANNING METHOD, OPERATION PLANNING DEVICE, METHOD FOR OPERATING HEAT PUMP HOT-WATER SUPPLY SYSTEM, AND METHOD FOR OPERATING HEAT PUMP HOT-WATER SUPPLY AND HEATING SYSTEM
OPERATION PLANNING METHOD, OPERATION PLANNING DEVICE, METHOD FOR OPERATING HEAT PUMP HOT-WATER SUPPLY SYSTEM, AND METHOD FOR OPERATING HEAT PUMP HOT-WATER SUPPLY AND HEATING SYSTEM
展开▼
机译:操作计划方法,操作计划装置,热泵供热系统的操作方法以及热泵供热和供热系统的操作方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
An operation planning method is a method for creating an operation plan for a second power load in a system provided with a power generating device, a first power load which operates using power generated by the power generating device, and a second power load which generates heat using the power generated by the power generating device. More specifically, the operation planning method comprises a prediction step (S101) for predicting the generated power amount generated by the power generating device (S102) and the consumed power amount consumed by the first power load in respective time zones separated by unit time, and an operation planning step (S103-S105) for creating the operation plan for the second power load so as to operate the second power load in an operation time zone including a time zone in which the reverse power amount obtained by subtracting the consumed power amount from the generated power amount becomes maximum.
展开▼