首页> 外国专利> METHOD OF INSTALLATION OF AN OFFSHORE WIND TURBINE AND COMBINATION OF AN OFFSHORE WIND TURBINE AND A FLOATING VESSEL

METHOD OF INSTALLATION OF AN OFFSHORE WIND TURBINE AND COMBINATION OF AN OFFSHORE WIND TURBINE AND A FLOATING VESSEL

机译:海上风轮机的安装方法以及海上风轮机和浮船的组合方法

摘要

A tower (2) of an offshore wind turbine is composed by a first section (3) and a second section (4) and is by means of a vessel (13) transported to an installation location in a non-upright position. The first section (3) and the second section (4) of the tower (2) are during raising of the tower connected pivotally about a hinge axis (10), and the first section (3) of the tower is swung about the hinge axis (10) down into the sea to its upright position when the second section (4) of the tower is still carried in a non-upright position by the vessel (13). The first section (3) of the tower is installed on the seabed (17), and, subsequently, the second section (4) of the tower is swung about the hinge axis (10) to its upright position and locked to the first section (3) of the tower in this position.
机译:海上风力涡轮机的塔架(2)由第一部分(3)和第二部分(4)组成,并且借助于船(13)以非直立位置运输到安装位置。塔架(2)的第一部分(3)和第二部分(4)在塔架的升高期间绕铰链轴线(10)枢转地连接,并且塔架的第一部分(3)围绕铰链摆动当塔架的第二部分(4)仍由船(13)保持在非直立位置时,轴线(10)向下进入海中直至直立位置。塔架的第一部分(3)安装在海床(17)上,随后,塔架的第二部分(4)围绕铰链轴(10)摆动到其竖立位置并锁定到第一部分(3)在这个位置上的塔。

著录项

  • 公开/公告号EP2437997A1

    专利类型

  • 公开/公告日2012-04-11

    原文格式PDF

  • 申请/专利权人 DONG ENERGY A/S;

    申请/专利号EP20100722105

  • 发明设计人 REBSDORF ANDERS VARMING;

    申请日2010-06-02

  • 分类号B66C1/62;B66C23/26;B66C23/52;F03D1;

  • 国家 EP

  • 入库时间 2022-08-21 17:12:55

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号