首页> 外国专利> EXCAVATION TUNNEL CONSTRUCTING METHOD USING VERTICAL SIDE WALL AND ARCH CELLING, AND EXCAVATION TUNNEL USING VERTICAL SIDE WALL AND ARCH CELLING CONSTRUCTED BY THIS

EXCAVATION TUNNEL CONSTRUCTING METHOD USING VERTICAL SIDE WALL AND ARCH CELLING, AND EXCAVATION TUNNEL USING VERTICAL SIDE WALL AND ARCH CELLING CONSTRUCTED BY THIS

机译:竖向方墙拱顶开挖隧道的施工方法及竖向方墙拱顶开挖隧道的施工方法

摘要

PURPOSE: A construction method of a cut-and-cover tunnel using a vertical side wall and an arched ceiling and a cut-and-cover tunnel using a vertical side wall and an arched ceiling through the same are provided to reduce construction time and costs by improving the structural stability of the tunnel even if the cross section of the tunnel is reduced. CONSTITUTION: A construction method of a cut-and-cover tunnel using a vertical side wall and an arched ceiling is as follows. A space having inclined and vertical parts is formed by excavating the ground of a mountain area along a first inclined excavation line(L1) and a second vertical excavation line(L2). Side walls(11) are installed in the vertical parts of the excavated space. An arched ceiling(12) is installed on the installed side walls.
机译:用途:提供一种使用垂直侧壁和拱形天花板的采挖隧道的施工方法以及使用垂直侧壁和拱形天花板的采挖隧道的方法,以减少施工时间和成本通过提高隧道的结构稳定性,即使减小了隧道的横截面也是如此。构成:采用竖向侧壁和拱形天花板的明挖隧道的施工方法如下。通过沿着第一倾斜挖掘线(L1)和第二垂直挖掘线(L2)挖掘山区的地面,形成具有倾斜部分和垂直部分的空间。侧壁(11)安装在挖掘空间的垂直部分。拱形天花板(12)安装在已安装的侧壁上。

著录项

  • 公开/公告号KR20120037212A

    专利类型

  • 公开/公告日2012-04-19

    原文格式PDF

  • 申请/专利权人 PARK YOUNG DAE;

    申请/专利号KR20100098836

  • 发明设计人 PARK YOUNG DAE;

    申请日2010-10-11

  • 分类号E21D9;E21D11/08;

  • 国家 KR

  • 入库时间 2022-08-21 17:10:15

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号