首页>
外国专利>
CONSTRUCTION WORK MANAGEMENT SYSTEM WITH FOUR DIMENSION
CONSTRUCTION WORK MANAGEMENT SYSTEM WITH FOUR DIMENSION
展开▼
机译:四维建筑工程管理系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A four-dimensional construction managing device which uses a matrix technique is provided to easily recognize and manage construction condition, construction period, and construction progress by displaying various construction related information. CONSTITUTION: An information storing unit(100) stores a matrix sheet for construction management displayed as an object for progress construction work display. An information outputting unit(300) outputs construction related information including a matrix sheet for construction work management. A main control unit(400) extracts a matrix sheet for construction management stored in the information storing unit by output request. The main control unit processes an input request of construction related information. [Reference numerals] (101) New matrix sheet DB; (102) Processing matrix sheet DB; (103) Construction CAD drawing DB; (200) Information inputting unit; (300) Information outputting unit; (410) Matrix X/Y axis node input information process engine; (420) Object input information treatment engine for construction work display; (430) Guide engine for construction; (440) Construction blue print drawing engine; (450) Multi coordinate layer treatment engine; (460) Subject movement treatment engine for construction display
展开▼