首页> 外国专利> MOMENT PRESTRESSED CONCRETE GIRDER AND CONSTRUCTION METHOD THEREOF

MOMENT PRESTRESSED CONCRETE GIRDER AND CONSTRUCTION METHOD THEREOF

机译:弯矩预应力混凝土梁及其施工方法

摘要

PURPOSE: A prestressed concrete girder in which moment prestress is applied and a manufacturing method thereof are provided to reduce manufacturing costs by remarkably reducing the amount of required steel bars. CONSTITUTION: A prestressed concrete girder(100) in which moment prestress is applied comprises a pair of block-out units, a compression member(120), tension members(110,110'), a pair of connectors(130), and cast-in-place concrete(140). The block-out units are arranged at positions separated from both ends of the girder. The compression member is buried in the top of the girder, and both ends of the compression member are exposed to the block-out units. The tension members are extended from the block-out units. The connectors connect the ends of the compression member to the ends of the tension members. Moment prestress is applied to the gap between the block-out units, and the gap between the block-out units is filled with the cast-in-place concrete.
机译:用途:一种施加预应力混凝土梁的预应力混凝土梁及其制造方法,通过显着减少所需的钢筋数量来降低制造成本。组成:施加有力矩预应力的预应力混凝土梁(100)包括一对封闭单元,一个压缩构件(120),受拉构件(110,110'),一对连接器(130)和现浇放置混凝土(140)。遮挡单元布置在与梁的两端分开的位置。压缩构件被掩埋在梁的顶部,并且压缩构件的两端暴露于遮挡单元。张紧构件从封闭单元伸出。连接器将压缩构件的端部连接到受拉构件的端部。在封闭单元之间的缝隙上施加了预应力,封闭单元之间的缝隙填充了现浇混凝土。

著录项

  • 公开/公告号KR101167660B1

    专利类型

  • 公开/公告日2012-07-20

    原文格式PDF

  • 申请/专利权人 SAM HYUN P??F. CO. LTD.;

    申请/专利号KR20110116195

  • 发明设计人 SHIN DONG KI;KIM CHOONG EON;

    申请日2011-11-09

  • 分类号E01D2;E04C3/20;

  • 国家 KR

  • 入库时间 2022-08-21 17:07:46

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号