首页> 外国专利> METHOD OF RECOVERY OF FLOODED GAS WELL WITH COLLAPSED PRODUCTION TUBING IN PRODUCTIVE INTERVAL

METHOD OF RECOVERY OF FLOODED GAS WELL WITH COLLAPSED PRODUCTION TUBING IN PRODUCTIVE INTERVAL

机译:生产区间塌陷采油管采气井的采收方法。

摘要

FIELD: oil and gas production.;SUBSTANCE: in compliance with proposed method, top section of production tubing is cut and extracted. Permanent cement plug is fitted in well flooded parent hole. Opening is cut above said plug in parent hole production tubing and extra hole is drilled not extending beyond parent hole of flooded well bottom zone to arrange shoe 2-3 mm above gas-water contact (GWC). Said extra hole is cased by casing liner and cemented. Said liner is perforated some 5-7 m above GWC to produce water-shutoff holes. Water-shutoff agent if injected via said holes to displace water down into bed to make water-shutoff shield. Water-shutoff composition forced through process holes for water-shutoff is made up by plasticised oil-well cement composition with increased penetrating capacity. Water-shutoff cement bridging from oil-well normal-density cement is arranged in liner to cover aforesaid process holes. After cement curing and testing cement bridging for strength and tightness, liner is perforated at productive bed top section to develop the well.;EFFECT: additional production of gas at minimum repair costs.;3 ex, 1 dwg
机译:领域:石油和天然气生产。实质:按照建议的方法,将生产管的顶部切开并抽出。永久水泥塞安装在充满水的母孔中。在母孔生产管中的所述塞子上方切出开口,并钻出额外的孔,该孔不延伸超过淹没井底区域的母孔,以将瓦块布置在气-水接触面(GWC)上方2-3 mm。所述额外的孔由套管衬里盖住并固结。所述衬里在GWC上方约5-7 m处打孔,以产生水切断孔。如果通过所述孔注入了阻水剂以将水向下排入床中以形成阻水屏蔽。被迫通过工艺孔进行堵水的堵水组合物由增透能力增强的油井水泥组合物组成。由油井常密度水泥桥接的堵水水泥布置在衬管中,以覆盖上述加工孔。水泥固化并测试水泥桥接的强度和密封性后,在生产床顶部开孔衬里以开发井。效果:以最低的维修成本增加天然气产量; 3 ex,1 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号