首页>
外国专利>
A method for setting of the piles on existing stake buildings, in particular of a boat houses and apparatus for carrying out the method
A method for setting of the piles on existing stake buildings, in particular of a boat houses and apparatus for carrying out the method
展开▼
机译:在现有的桩基建筑物上,特别是在船屋上设置桩的方法以及实施该方法的设备
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for setting of the piles on existing stake buildings, in particular of a boat houses, in which under utilization of the resistance force from the mass of the seating pile construction of a pile (10), on the one hand, in addition to a supporting wall (4) into the underground (9) and the stilt pressed under utilization of the resistance force of the pile (10) is intercepted, characterized in that the pile (10) to a height below the supporting wall (4) and a second pole (11), on the other hand, the supporting wall (4) to the same height as the first pile (10) and the stilt is pressed under utilization of the resistance forces of the two piles (10) and (11) and to the original height of the wall (4) is lifted and in this position is anchored.
展开▼