首页>
外国专利>
SUBMERGED DYKE REVETMENT CONSTRUCTION METHOD FOR SEA ROUTE
SUBMERGED DYKE REVETMENT CONSTRUCTION METHOD FOR SEA ROUTE
展开▼
机译:海堤淹没堤施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a submerged dyke revetment construction method which prevents floating mud from being accumulated in a sea route.;SOLUTION: In a submerged dyke revetment construction method for a sea route, a submerged dyke is constructed by longitudinally arranging submerged dyke units on shoulder sections on both the sides of the sea route, through the use of the submerged dyke unit which has an anchor provided at a lower end of a rubber plate or a wooden plate, having an upper part provided with a float, and/or the triangular submerged dyke unit which has a body of a triangular prism-shaped form covered with a wire net and which has a plate-like body or a sheet film body suspended from the internal top of the triangular prism-shaped form.;COPYRIGHT: (C)2013,JPO&INPIT
展开▼