首页> 外国专利> BLOCKAGE MANAGEMENT SYSTEM, ON-RAIL TRAIN MANAGEMENT SYSTEM, BLOCKAGE MANAGEMENT METHOD, AND ON-RAIL TRAIN MANAGEMENT METHOD

BLOCKAGE MANAGEMENT SYSTEM, ON-RAIL TRAIN MANAGEMENT SYSTEM, BLOCKAGE MANAGEMENT METHOD, AND ON-RAIL TRAIN MANAGEMENT METHOD

机译:封锁管理系统,火车上管理系统,封锁管理方法和火车上管理方法

摘要

PROBLEM TO BE SOLVED: To achieve a system in consideration of upbound and downbound trains on a single-track line.;SOLUTION: At a station where single-track lines cross each other, when the arrival of a train 30a at a predetermined position in the area is detected, the blockage of an in-area blocked section A2 at the arrival position is temporarily cancelled. The temporary cancellation means a blocking state which is considered to secure blockage in the same direction and to cancel blockage in the opposite direction. Thus, a train 30b in the opposite direction (downbound direction), which is on rail at the same station, can secure the blockage of the next blocked section (inter-station blocked section) B1 although the next blocked section B1 competes against the in-area blocked section A2 in the opposite direction.;COPYRIGHT: (C)2013,JPO&INPIT
机译:解决的问题:要实现一种考虑单轨线路上的上,下行列车的系统。解决方案:在单轨线路相互交叉的车站,当火车30a到达预定位置时,在检测到该区域的情况下,暂时消除到达位置处的区域内遮挡区域A2的遮挡。临时取消是指被认为可以确保在相同方向上的堵塞并且在相反方向上的堵塞被消除的堵塞状态。因此,尽管下一个被阻止的区间B1与入口处的竞争,但是在同一站的轨道上沿相反方向(下行方向)的火车30b可以确保下一个被阻止的区间(站间被阻止的区间)B1的阻塞。 -区域A2的反向遮挡区域。;版权所有:(C)2013,日本特许厅和INPIT

著录项

  • 公开/公告号JP2013193625A

    专利类型

  • 公开/公告日2013-09-30

    原文格式PDF

  • 申请/专利权人 RAILWAY TECHNICAL RESEARCH INSTITUTE;

    申请/专利号JP20120064835

  • 发明设计人 SASAKI TATSUYA;

    申请日2012-03-22

  • 分类号B61L23/30;

  • 国家 JP

  • 入库时间 2022-08-21 17:02:56

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号