首页> 外国专利> RECONSTRUCTING METHOD OF STEEL TOWER FOR OVERHEAD TRANSMISSION LINE

RECONSTRUCTING METHOD OF STEEL TOWER FOR OVERHEAD TRANSMISSION LINE

机译:架空输电线路钢塔的改造方法

摘要

PROBLEM TO BE SOLVED: To provide a reconstructing method of a strain steel tower, which can reduce the number of charge part stopping days or a modification cost by decreasing the modification amount of members.;SOLUTION: A new steel tower is constructed while ensuring a work safe distance by a modified arm 23 obtained by modifying an arm of an existing steel tower 100 to be long. At that time, a strain insulator sting is changed to a suspension insulator string to suppress torsion force generated on a tower body, and the amount of steel tower modifying construction is reduced to decrease the number of stopping days or a construction cost. Existing strain clamps in a fore-and-aft span are coupled by a supporting wire, thereby suppressing the generation of electric wire construction which requires expensive construction costs. The supporting line is made to be an electric wire of the same kind as that of the span, thereby making a suspension device compact, and enabling the suspension device to be applied for a facility having long insulator length.;COPYRIGHT: (C)2013,JPO&INPIT
机译:解决的问题:提供一种应变钢塔的重建方法,该方法可通过减少构件的修改量来减少装料部停工天数或修改成本。解决方案:在确保安全的前提下建造新的钢塔通过将现有的钢塔100的臂变长而得到的变臂23的安全距离。那时,将应变绝缘体的ing绳改为悬挂绝缘体柱以抑制在塔体上产生的扭力,并且减少了钢塔改型的施工量,从而减少了停工天数或降低了施工成本。前后跨中的现有应变夹通过支撑线连接,从而抑制了电线构造的产生,这需要昂贵的构造成本。使支撑线成为与跨度相同种类的电线,从而使悬挂装置紧凑,并且使得该悬挂装置能够用于绝缘体长度较长的设备。版权所有:(C)2013 ,JPO&INPIT

著录项

  • 公开/公告号JP2013128357A

    专利类型

  • 公开/公告日2013-06-27

    原文格式PDF

  • 申请/专利权人 TOKYO ELECTRIC POWER CO INC:THE;

    申请/专利号JP20110276839

  • 发明设计人 SHIGA TOSHIHITO;

    申请日2011-12-19

  • 分类号H02G1/02;E04H12/10;

  • 国家 JP

  • 入库时间 2022-08-21 17:02:35