首页>
外国专利>
EARTH RETAINING JIG FOR REPAIRED PORTION OF REINFORCED SOIL WALL, EARTH RETAINING METHOD USING THE EARTH RETAINING JIG, AND REPAIR METHOD FOR REINFORCED SOIL WALL
EARTH RETAINING JIG FOR REPAIRED PORTION OF REINFORCED SOIL WALL, EARTH RETAINING METHOD USING THE EARTH RETAINING JIG, AND REPAIR METHOD FOR REINFORCED SOIL WALL
展开▼
机译:加筋土墙的修补部分的土方夹具,使用土方夹具的土固方法和加筋土墙的修补方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a repair method for a reinforced soil wall capable of shortening a construction period and reducing construction cost as compared with a conventional method, an earth retaining method used for the repair method, and an earth retaining jig used for the earth retaining method.;SOLUTION: An earth retaining jig includes at least: a pressure receiving part arranged on an exposed surface of a banking; and a connection part for fixing a reinforcement material exposed from the banking. An earth retaining method arranges the earth retaining jig on a banking surface while removing a wall surface material to be repaired so as to easily carry out earth retaining. A repair method for a reinforced soil wall constructs a new wall surface material after the earth retaining method. At that time, the earth retaining jig may be removed or may be left buried.;COPYRIGHT: (C)2013,JPO&INPIT
展开▼