首页> 外国专利> And residual stress method for improving the piping, the construction management method

And residual stress method for improving the piping, the construction management method

机译:和残余应力法改善管道,施工管理方法

摘要

PPROBLEM TO BE SOLVED: To provide a method for compressing a tensile residual stress working on an inner surface in the vicinity of a pipe welded part at a 350°C construction temperature. PSOLUTION: A step is repeated at least twice, wherein, after heating the vicinity of the pipe welded part at the 350°C construction temperature by heater heating from the outer surface, cooling water is supplied to the pipe inside to rapidly cool the inner surface. In the construction management, a temperature difference between inner and outer surfaces is evaluated based on lowering speed of the outer surface temperature when the cooling water is supplied to rapidly cool the inner surface, and on a pipe plate thickness at a temperature measuring position, and it is confirmed that a thermal stress generated by the temperature difference between the inner and outer surfaces is equal to or higher than a yield stress of a pipe material. PCOPYRIGHT: (C)2012,JPO&INPIT
机译:<要解决的问题:提供一种在<350℃的构造温度下压缩在管道焊接部件附近的内表面上作用的拉伸残余应力的方法。

解决方案:至少重复步骤两次,其中,通过加热器从外表面加热以<350℃的构造温度加热管道焊接部分附近后,将冷却水迅速供应到管道内部。冷却内表面。在施工管理中,基于在供给冷却水以迅速冷却内表面时的外表面温度的降低速度以及在温度测量位置处的管板厚度来评估内外表面之间的温度差。可以确认由内外表面之间的温度差产生的热应力等于或高于管材的屈服应力。

版权:(C)2012,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号