The phase which in the earth under the bearing pile application mannered null raceway for construction
The phase which in the earth under the bearing pile application mannered null raceway for construction
展开▼
机译:承重桩下的土层构成零轨道的施工阶段。
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a construction method for shortening the length of a support pile for supporting construction beams for receiving a track when constructing a structure in the ground under the railroad track.;SOLUTION: In this construction method, steel elements are sequentially inserted into the ground 3 under the track 1, concrete is placed in the elements and between the elements to construct a lower floor slab 10, and then the support pile 20 is constructed on the lower floor slab 10 to support the construction beams 2 on a roadbed in order to protect the track 1.;COPYRIGHT: (C)2010,JPO&INPIT