The phase which in the earth under the bearing pile application mannered null raceway for construction

机译:承重桩下的土层构成零轨道的施工阶段。

摘要

PROBLEM TO BE SOLVED: To provide a construction method for shortening the length of a support pile for supporting construction beams for receiving a track when constructing a structure in the ground under the railroad track.;SOLUTION: In this construction method, steel elements are sequentially inserted into the ground 3 under the track 1, concrete is placed in the elements and between the elements to construct a lower floor slab 10, and then the support pile 20 is constructed on the lower floor slab 10 to support the construction beams 2 on a roadbed in order to protect the track 1.;COPYRIGHT: (C)2010,JPO&INPIT
机译:要解决的问题:提供一种在铁路轨道下的地下建筑结构时,缩短用于支撑用于接收轨道的建筑梁的支撑桩的长度的施工方法。将混凝土插入轨道1下方的地面3中,将混凝土放置在构件中以及构件之间,以构造下楼板10,然后在下楼板10上构造支撑桩20,以将建筑梁2支撑在地板上。路基以保护轨道1 .;版权:(C)2010,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号