Method for managing material flows synchronization in a batch manufacturing process including a plurality of activities includes: representing the material flow between each of any two of the connected activities by a pegging arc, where a source activity is supplying at least a portion of an associated quantity of the material to a target activity, where the quantity represents at least a portion of an associated quantity of the material; assigning to each pegging arc an order; following the assigned order, determining, for each pegging arc a speed CT at which the target activity consumes the material, and a speed PT at which the source activity produces the material; and according to CT and PT, determining which portion of a processing time of the production of the material by the source activity is to be dedicated to which portion of a processing time of the target activity.
展开▼
机译:在包括多个活动的批生产过程中管理物料流同步的方法包括:用钉弧表示连接的任何两个活动之间的物料流,其中源活动正在提供关联量的至少一部分材料达到目标活动的数量,其中数量表示材料的关联数量的至少一部分;向每个钉弧分配一个命令;按照分配的顺序,为每个钉弧确定目标活动消耗材料的速度C T Sub>和源活动产生的速度P T Sub>材料;并根据C T Sub>和P T Sub>,确定通过源活动在物料生产中处理时间的哪一部分专门用于处理的哪一部分目标活动的时间。
展开▼