Techniques are presented for rescheduling manufacturing releases. A plurality of release information elements are identified based on a first run of a first advanced planning system. The release information elements comprise dates of planned manufacturing release and quantity. The plurality of release information elements are sorted based on associated demand-likelihood factors and a plurality of sorting criteria. Swapping candidates are selected and swaps are performed based on the demand-likelihood factors and at least one swapping constraint. The plurality of release information elements are then fixed and output as results. A second run of an advanced planning system is optionally performed before output and may include stability features.
展开▼