ROCK-FILL DAM DEFORMATION CONTROL METHOD

机译:堆石坝变形控制方法

摘要

A rock-fill dam deformation control method comprises the following steps of: preparing a pasty stable grouting liquid and cement mortar; drilling holes in the dam body of the rock-fill dam, the holes comprising stable grouting liquid grouting holes for sealing, and filling grouting holes; and grouting: injecting the pasty stable grouting liquid into two rows of holes around a filling grouting area to make the pasty stable grouting liquid and a concrete panel on the upstream side of the rock-fill dam form an enclosed area; injecting the cement mortar into holes in the grouting area in an orifice filling mode after the pasty stable grouting liquid has been injected for 14 days, and controlling the rock-fill dam deformation after the grouting area has been grouted for 28 days. The method can improve the deformation resistance of the rock-fill dam, the deformation of the dam body can be controlled, the grouting quality can be guaranteed, and may be applied to unsafe rock-fill dam or water resources and hydropower engineering rock-fill deformation control.
机译:堆石坝变形控制方法包括以下步骤:制备糊状稳定的灌浆液和水泥砂浆。在堆石坝坝体上钻孔,该孔包括用于密封的稳定的灌浆液灌浆孔和灌浆孔;灌浆:将糊状稳定灌浆液注入到灌浆区周围的两排孔中,使糊状稳定灌浆液和堆石坝上游侧的混凝土板形成封闭区域;在注入糊状稳定灌浆液14天后,以孔填充方式将水泥砂浆注入灌浆区的孔中,并在灌浆区灌浆28天后控制堆石坝变形。该方法可提高堆石坝的抗变形能力,可控制坝体变形,保证灌浆质量,可用于不安全的堆石坝或水利水电工程堆石中。变形控制。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号