首页>
外国专利>
DERRICK LOADING METHOD FOR A DRILLSHIP CAPABLE OF QUICKLY LOADING A DERRICK IN A HULL OF A DRILLSHIP REGARDLESS OF VARIATION OF MARINE CLIMATE
DERRICK LOADING METHOD FOR A DRILLSHIP CAPABLE OF QUICKLY LOADING A DERRICK IN A HULL OF A DRILLSHIP REGARDLESS OF VARIATION OF MARINE CLIMATE
展开▼
机译:无需考虑海洋气候变化就可以快速将井架装载到船体中的井架的井架装载方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A derrick loading method for a drillship is provided to quickly construct a drill ship by reducing time required for moving an offshore crane to a place where a derrick is positioned.;CONSTITUTION: A derrick loading method for a drillship is as follows. A derrick positioned in land is coupled to a land crane(S110). The land crane pulls the derrick positioned in land(S120). If the derrick is pulled by the land crane, the land crane moves to a dock where a drillship is constructed(S130). If the land crane pulling the derrick is positioned at the dock, the pulled derrick is put down on a right position where the derrick is installed in a hull of the drillship(S140). The derrick positioned at the right position of the hull is fixed on the hull(S150). The fastening of the derrick with the land crane is released(S160). The land crane leaves the dock(S170).;COPYRIGHT KIPO 2013;[Reference numerals] (AA) Start; (BB) End; (S110) Coupling step; (S120) Lifting step; (S130) Transporting step; (S140) Aligning step; (S150) Fixing step; (S160) Releasing step; (S170) Returning step
展开▼