首页> 外国专利> ACCELERATING CONSTRUCTION METHOD FOR SINKING AND SUBSIDING A DREDGED SOIL USING A HORIZONTAL DRAIN MODULE CAPABLE OF ACCELERATING SINKING AND SUBSIDENCE BY RAPIDLY REMOVING THE MOISTURE OF A DREDGING RECLAMATION SOIL USING A HORIZONTAL DRAIN MODULE CONNECTED WITH A PERFORATED DRAINPIPE OR A DRAIN BOARD, A VACUUM AND DRAIN PUMP, AND A MULTISTAGE TYPE INSTALLATION BEFORE AND DURING A LANDFILL FOR THE SAME

ACCELERATING CONSTRUCTION METHOD FOR SINKING AND SUBSIDING A DREDGED SOIL USING A HORIZONTAL DRAIN MODULE CAPABLE OF ACCELERATING SINKING AND SUBSIDENCE BY RAPIDLY REMOVING THE MOISTURE OF A DREDGING RECLAMATION SOIL USING A HORIZONTAL DRAIN MODULE CONNECTED WITH A PERFORATED DRAINPIPE OR A DRAIN BOARD, A VACUUM AND DRAIN PUMP, AND A MULTISTAGE TYPE INSTALLATION BEFORE AND DURING A LANDFILL FOR THE SAME

机译:通过使用水平排水沟,与之相连的垂直排水沟,水平排水沟,通过水平排泄土壤的湿润性的快速消除,利用水平排水模块对水平土体进行沉降和沉降的加速施工方法泵,以及在同一填土之前和期间的多阶段类型安装

摘要

PURPOSE: An accelerating construction method for sinking and subsiding a dredged soil using a horizontal drain module and a multistage installation before and during a landfill are provided to be able to reclaim more dredged soil in the same place by accelerating the sinking, self weight consolidation, and subsidence of a dredged soil in the drain speed of fast pore water at the time of dumping a dredged soil, and bring in and improve equipments with a dredged soil earthenware at the same time by loading a preloading by the use of a vacuum pressure.;CONSTITUTION: An accelerating construction method for the sinking and subsidence of a dredged soil using a horizontal drain module comprises the following processes. A drain board(3) capable of discharging underground pore water is fixed at regular intervals using a fixing hook(2) in a steel frame(1) or a soft rope. In order to discharge pore water and load a vacuum pressure and a pressure, a drain member is connected to a drain system(4) and a vacuum pump(5) or a compressor and a consolidation and subsidence are accelerated.;COPYRIGHT KIPO 2013;[Reference numerals] (AA) Drain module plane
机译:目的:提供一种利用水平排水模块下沉和沉降疏dr土壤的加速施工方法,以及在垃圾填埋场之前和期间进行多级安装,以通过加速下沉,自重固结,倾倒疏soil土壤时,疏松土壤的沉降会导致快速孔隙水的排水速度下降,同时通过利用真空压力加载预载来同时引入和改良带有疏soil土壤陶器的设备。 ;组成:采用水平排水模块的疏soil土壤下沉和沉降的加速施工方法,包括以下过程。使用固定钩(2)在钢制框架(1)或软绳中以固定的间隔固定能够排放地下孔隙水的排水板(3)。为了排出孔隙水并加载真空压力和压力,将排水部件连接到排水系统(4)和真空泵(5)或压缩机上,以加速固结和沉降。; COPYRIGHT KIPO 2013; [参考数字](AA)排水模块平面

著录项

获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号