STANDARDIZATION METHOD FOR SETTING REFERENCE POINT FOR LOADING ON THE SEA AFTER CONSTRUCTING DRILLSHIP AT HEAVY ZONE
STANDARDIZATION METHOD FOR SETTING REFERENCE POINT FOR LOADING ON THE SEA AFTER CONSTRUCTING DRILLSHIP AT HEAVY ZONE
展开▼
机译:重区施工钻孔后海面上荷载设定参考点的标准化方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A standardization method for setting a reference point of loading components in a drillship is provided to load all the blocks and equipment on the topside of the drillship without an additional auxiliary point. CONSTITUTION: A standardization method for setting a reference point of loading components in a drillship is as follows: a step of obtaining data with alignment test instruments in a state that a body of the drillship is completed in land(S20); a step of setting a reference point based on an existing reference point or a current well center(S40); a step of setting the coordinate of an auxiliary point according to a standard loading process(S60); a step of setting the auxiliary point on the reference point(S80); a step of maintaining even keel by blasting in a state of floating on the sea; and a step of working and loading all the blocks, equipment, and other fittings on the drillship using the instruments(S120). [Reference numerals] (S100) Maintain even keel by blasting in a state of floating on the sea; (S120) Work on all blocks, equipment, and other fittings on the sea using a three-dimensional measuring instrument; (S20) Obtain data with an alignment test after completion in land; (S40) Set a '0(zero)' reference point based on an existing reference point or a current well center; (S60) Set a coordinate of an auxiliary point according to a standard process; (S80) Set the auxiliary point coordinate as reference
展开▼