首页> 外国专利> OPTIMIZED DIGITAL FACTORY PRODUCTION PLAN & CONFIRM SYSTEM BY USING REAL-TIME FACTORY SITUATION

OPTIMIZED DIGITAL FACTORY PRODUCTION PLAN & CONFIRM SYSTEM BY USING REAL-TIME FACTORY SITUATION

机译:利用实时工厂状况优化数字工厂生产计划与确认系统

摘要

PURPOSE: An optimized production plan of a digital factory reflecting a real time factory situation and a result confirmation system are provided to add a scheduler function to the digital factory, thereby supplying a dynamic digital factory. CONSTITUTION: A 4M real measurement unit(41) measures human and material resources of a real factory(1). A 4M standard time calculation unit(42) calculates each 4M standard time through a 4M database which is constructed through the 4M real measurement unit. A task scenario generation unit(44) generates a production scenario corresponding to optimized production efficiency. A scenario schedule display unit(46) displays the generated task scenario in real time. [Reference numerals] (1) Real factory; (41) 4M real measurement unit; (42) 4M standard time calculation unit; (43) 4M data change input unit; (44) Task scenario generation unit; (45) Order data input unit; (46) Scenario schedule display unit
机译:目的:提供反映实时工厂情况的优化数字工厂生产计划和结果确认系统,以向数字工厂添加调度程序功能,从而提供动态数字工厂。组成:一个4M的真实测量单元(41)测量一个真实工厂(1)的人力和物力。 4M标准时间计算单元(42)通过4M数据库计算每个4M标准时间,该4M数据库是由4M实际测量单元构建的。任务方案生成单元(44)生成与优化的生产效率相对应的生产方案。脚本时间表显示单元(46)实时显示生成的任务脚本。 [附图标记](1)实际工厂; (41)4M实测单位; (42)4M标准时间计算单元; (43)4M数据变更输入单元; (44)任务场景生成单元; (45)订单数据输入单元; (46)情景时间表显示单元

著录项

  • 公开/公告号KR101245151B1

    专利类型

  • 公开/公告日2013-03-19

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20110079020

  • 发明设计人 김수영;

    申请日2011-08-09

  • 分类号G06Q10/06;G06Q10/04;G05B19/418;

  • 国家 KR

  • 入库时间 2022-08-21 16:25:29

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号