首页> 外国专利> SYSTEMS AND METHODS USING A FAST-CHANGE TECHNOLOGICAL MODULE FOR PRESSURE CASTING

SYSTEMS AND METHODS USING A FAST-CHANGE TECHNOLOGICAL MODULE FOR PRESSURE CASTING

机译:使用快速变化的技术模块进行压铸的系统和方法

摘要

1. A method comprising: loading a processing module onto a carrier block for modules; inserting a carrier block for modules into an injection press so that the carrier block is placed on a support element of an injection molding press; aligning the processing module with the outlet side of the mold base. ... The method according to claim 1, wherein loading the technological module comprises removing the technological module from the carrier carriage. The method of claim 2, further comprising: moving the carrier block for modules from the carrier carriage to the injection press using an overhead crane. The method according to claim 1, wherein the loading comprises fixing the technological module on the carrier block for the modules by means of one or more pneumatic gates. The method of claim 1, wherein the support member comprises at least one connecting rod. The method of claim 1, further comprising: opening the injection press prior to inserting the module carrier block. The method according to claim 1, further comprising: disconnecting the processing module from the carrier unit for the modules; opening the injection press; and removing the module carrier block from the injection press. 8. The method of claim 7, further comprising placing the carrier unit for the modules on the carrier cart. The method of claim 7, further comprising: closing the injection press such that the process module aligns with the inlet side of the mold base; inserting a core for threading into the process module; extruding the casting material into the process module from the inlet side of the mold base; providing cooling capabilities of the process module�
机译:1。一种方法,包括:将处理模块加载到模块的载体块上;将模块的承载块插入注塑机中,以便将承载块放置在注塑机的支撑元件上;将处理模块与模具底座的出口侧对齐。 2.根据权利要求1所述的方法,其特征在于,装载技术模块包括从搬运车上卸下技术模块。 3.根据权利要求2所述的方法,其特征在于,还包括:使用高架起重机将用于模块的承载块从承载架移动到注射压力机。 2.根据权利要求1所述的方法,其特征在于,所述装载包括通过一个或多个气动门将所述技术模块固定在用于所述模块的所述载体块上。 2.根据权利要求1所述的方法,其中,所述支撑构件包括至少一根连杆。 2.根据权利要求1所述的方法,其特征在于,还包括:在插入模块载体块之前,打开注射压力机。 2.根据权利要求1所述的方法,进一步包括:从所述模块的所述载体单元上断开所述处理模块;打开注塑机;并从注塑机上卸下模块载体块。 8.如权利要求7所述的方法,其特征在于,还包括将用于所述模块的所述搬运单元放置在所述搬运车上。 8.根据权利要求7所述的方法,还包括:关闭所述注射压力机,使得所述处理模块与所述模具基座的所述入口侧对准;将用于穿线的芯插入处理模块中;从模座的入口侧将铸造材料挤出到处理模块中;提供过程模块的冷却能力。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号