首页> 外国专利> CONTROL METHOD OF POORLY CAVING ROOF AT ENTRY OF MECHANISED COMPLEX TO REMOVAL CHAMBER

CONTROL METHOD OF POORLY CAVING ROOF AT ENTRY OF MECHANISED COMPLEX TO REMOVAL CHAMBER

机译:机械化复合物去除腔室时屋面开裂的控制方法

摘要

FIELD: mining.;SUBSTANCE: before the face enters the formation roof, wells are drilled towards each other on the side of extraction gates, in pairs as to formation and parallel to the support line at the distance from the well projection to the bottom of formation to the nearest point of removal chamber, which is equal to 0.7-0.8 of periodic step of convergence of the main roof; they are charged and blasted after the support line, by means of which a support is created on the side of worked-out space for a hanging plate of the main roof throughout the length of face by using the roof rocks fallen during blasting operations. Coal pillar arranged between mechanised support and removal chamber is provided with artificial flexibility and extracted under protection of the plate of the main roof, which is borne against the rocks fallen during the well blasting operations. The specified artificial flexibility is provided for the pillar by drilling from removal chamber of wells at the formation roof towards the face.;EFFECT: considerable improvement of safe operations at entry of the complex into removal chamber in wide range of conditions of coal beds occurrence.;2 cl, 3 dwg
机译:领域:采矿;实体:在工作面进入地层顶板之前,在抽采闸门的侧面将井彼此相对地钻,成对成对并平行于从井投影到井底的距离的支撑线形成到去除室的最近点,该点等于主顶板收敛的周期性步长的0.7-0.8;在支撑线之后对它们进行装填和爆破,通过使用爆破过程中掉落的屋面岩石,在工作空间的一侧为整个屋顶整个主顶板的悬挂板提供支撑。布置在机械化支撑和去除室之间的煤柱具有人为的柔韧性,并在主顶板的保护下被抽出,该顶板抵御在爆破作业中掉落的岩石。通过从地层顶板的井的卸除室向工作面钻孔,为柱子提供了指定的人工柔韧性。效果:在多种煤床发生条件下,将复合体进入卸除室时,安全操作得到了相当大的改善。 ; 2 cl,3 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号