首页> 外国专利> METHOD OF DEVELOPMENT OF ISOLATED LITHOLOGICALLY SCREENED OIL-SATURATED LENS

METHOD OF DEVELOPMENT OF ISOLATED LITHOLOGICALLY SCREENED OIL-SATURATED LENS

机译:分离岩性筛分油饱和透镜的开发方法

摘要

FIELD: oil and gas industry.;SUBSTANCE: according to the method lens and productive formation below lens are opened with a single well. A set of geologic-geophysical, hydrodynamic, core, fluidal PVT surveys is performed, in particular, borders are determined and lens profile is analysed. 3D geologic and 3D hydrodynamic models of oil-saturated lens and productive formation below it are created. 3D hydrodynamic model is adapted to results of all the surveys. Perforation holes are made in the central part of lens, through which by means of forcing of easily filtering plugging composition a barrier is formed preventing premature flooding of well and increasing of lens volumetric efficiency by forcing out. Well is perforated in lens bottom part and in interval of productive formation to provide overflow of fluid influx from productive formation to bottom part of lens. Well is perforated in roof part of lens to provide product removal. Intervals of well perforation in bottom and roof parts of lens are separated, then product is removed in water-pressure mode provided by productive formation located below.;EFFECT: increasing oil removal coefficient at minimum costs.;4 cl, 3 dwg
机译:领域:石油和天然气工业。物质:根据该方法,用一口井打开透镜和透镜下面的生产地层。进行了一组地质-地球物理,水动力,岩心,流体PVT测量,尤其是确定了边界并分析了透镜剖面。创建了油饱和透镜及其下方的生产地层的3D地质和3D流体动力学模型。 3D水动力模型适用于所有调查的结果。在镜片的中央部分打孔,通过迫使容易过滤的堵塞组合物形成一个屏障,以防止孔过早涌出并通过排除而增加镜片的容积效率。井在透镜的底部和生产地层的间隔中打孔,以提供从生产地层到透镜的底部的流体流入的溢流。孔在透镜的顶部穿孔,以去除产品。分离透镜底部和顶部的井眼穿孔间隔,然后以位于下方的生产地层提供的水压模式去除产品;效果:以最小的成本增加除油系数; 4 cl,3 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号