首页> 外国专利> METHOD FOR CONSTRUCTION AND SUPPORT OF MINES UNDER COMPLICATED MINING AND GEOLOGICAL CONDITIONS

METHOD FOR CONSTRUCTION AND SUPPORT OF MINES UNDER COMPLICATED MINING AND GEOLOGICAL CONDITIONS

机译:复杂开采和地质条件下矿山的建设与支撑方法

摘要

FIELD: mining.;SUBSTANCE: method for construction and support of mines under complicated mining and geological conditions includes formation of an unloading cavity in front of a bottomhole with irreducible advancing, introduction of two rows of pneumatic balloons with a shield into the unloading cavity, lifting of the shield to the level of the mine roof, creation of a thrust between the cavity roof and pneumatic balloons by means of compressed air supply into pneumatic balloons, extraction of rock under the shield by the pitch of permanent support frames installation, and installation of stands and the beam of the permanent support under the shield. At the same time an additional unloading cavity is developed in the mine sides, and installation of the permanent support beam is carried out between rows of pneumatic balloons from the cavity of the mine arranged in the sides. Afterwards the permanent support stands under the shield are fixed to the support beams, the thrust is removed from the pneumatic balloons of the first row by means of exhaust of compressed air, and pneumatic balloons are extracted into the fixed part of the mine. Rock under the shield is removed by the pitch of permanent support frames installation, the thrust is removed from the pneumatic balloons of the second row by means of exhaust of compressed air, and pneumatic balloons are extracted into the fixed part of the mine. Then the unloading cavity is constructed to the initial depth, and operations are repeated.;EFFECT: higher efficiency and safety of construction and support of developing entries under complicated mining and geological conditions.;7 dwg
机译:领域:采矿;物质:在复杂的采矿和地质条件下建造和支撑矿井的方法包括:在井底前形成不可减退的卸料腔,将两排带有护罩的气动气球引入卸料腔,将防护罩提升到矿井顶板的高度,通过向气动气球中供应压缩空气在型腔顶板与气动气球之间产生推力,通过永久性支撑框架的安装间距在防护罩下抽出岩石,并进行安装支架和盾构下方的永久支撑梁。同时,在矿井的侧面形成了一个额外的卸料腔,并在排成一排的矿井腔中的成排的气动气球之间安装了永久支撑梁。之后,将位于防护罩下方的永久性支撑架固定在支撑梁上,通过排出压缩空气从第一排的气球中去除推力,然后将气球抽入矿井的固定部分。盾构下方的岩石通过永久性支撑框架安装的间距去除,通过压缩空气的排出将推力从第二排的气动气球中去除,并将气动气球抽入矿井的固定部分。效果:在复杂的采矿和地质条件下,更高的施工效率和安全性以及对发育中的入口的支持。; 7 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号