METHOD FOR OPEN MINING OF MINERAL DEPOSITS BY APPLICATION OF MILL HOLES AND CYCLICAL AND CONTINUOUS METHOD (CCM)

机译:应用钻孔法进行矿床露天开采的方法及循环连续法(CCM)

摘要

FIELD: mining.;SUBSTANCE: method includes identification of stages and substages and arrangement of a deep pit at differentiated angles of a slope, a board in accordance with reducing natural and anthropogenic damage of massif rocks with depth to arrangement of vertical ledges and sections of the board in deep zones. The stripping thickness of rocks is separated in the transverse cut in hanging and lying sides of the deposit for inclined and steeply inclined layers with capacity corresponding to substages and stages of the developed deposit. When the pit is operated at the first stage, the ore body is stripped with mill holes so that the ore transportation arm makes the minimum value. The milling link is installed near the mouth of mill holes. And also mill holes and inclined mines are tunnelled with a conveyor for ore delivery to a factory or a reloading point. Mill holes are tunnelled by drilling and required inclination of a mill hole shaft with (for instance, 65-70°). The optimal weighted average ore (rock) piece is provided with the help of a drilling device and thorough cutting of the mill hole with required parameters. To eliminate critical compaction of ore mass, as pieces collide with the "cushion", adjacency of the hopper to the mill hole is arranged at the angle for collection of bulk material in the hopper in the loose condition. Freezing of the ore mass or formation of anthropogenic mud flow due to water saturation is excluded with its continuous transportation and discharge from a manhole device to a feeder and a conveyor or directly into rail cars during liquidation of random vault formation from large ore (rock) pieces. Besides, the feeder and the conveyor are arranged in the upper part of the mine, and cars - in the lower part, and operations are continued as mining works and mill hole cutting gets deeper with movement of the drilling complexes to lower horizons with the minimum arm of ore (rock) haulage. When operating in other zones (along ore trend) or its completion, for these purposes other mill holes are arranged so that the achieved arm of ore haulage compensated costs for their arrangement.;EFFECT: increased efficiency of ore transportation from deep pits.;1 ex, 7 dwg
机译:领域:采矿;方法:该方法包括识别阶段和子阶段以及在斜坡的不同角度上深坑的布置,根据深度降低地块岩石的自然和人为破坏对垂直壁架和剖面的布置的板在深处的木板。岩石的剥离厚度在倾斜和陡倾层的垂悬面和垂面的横向切口中分开,其能力对应于已开发沉积物的子阶段和阶段。当在第一阶段操作矿井时,将矿体上的磨孔剥掉,以使矿石运输臂达到最小值。铣削连杆安装在铣削孔口附近。轧机孔和倾斜的矿井也用输送机开挖,以将矿石运送到工厂或再装货点。通过钻孔将铣削孔挖出,并要求铣削孔轴倾斜(例如65-70°)。借助钻探设备并根据需要的参数对铣削孔进行彻底切割,可以提供最佳的加权平均矿石(岩石)块。为了消除矿石质量的严格压实,当碎片与“垫层”碰撞时,将料斗与磨机孔的邻接关系布置成一定角度,以便在松散状态下将散装物料收集在料斗中。由于从水井中连续浸入并连续排入沙井设备到给料机和输送机或直接从大矿石(岩石)中清除形成的拱顶期间,矿块的冻结或由于水饱和而导致的人为泥浆流的形成被排除在外。件。此外,给料机和输送机布置在矿井的上部,而汽车则布置在矿井的下部,随着采矿工作和铣削孔的深入,随着钻探综合体向较低层位的移动,钻具的最小移动量继续进行矿石(岩石)运输臂。当在其他区域(沿矿石趋势)或其完工时,出于这些目的,还安排了其他轧机孔,以使已实现的矿石运输臂补偿了它们的布置成本。;效果:提高了深坑矿石运输的效率。; 1例如7 dwg

著录项

  • 公开/公告号RU2495244C2

    专利类型

  • 公开/公告日2013-10-10

    原文格式PDF

  • 申请/专利权人 EREMIN GEORGIJ MIKHAJLOVICH;

    申请/专利号RU20120100227

  • 发明设计人 EREMIN GEORGIJ MIKHAJLOVICH;

    申请日2012-01-10

  • 分类号E21C41/00;

  • 国家 RU

  • 入库时间 2022-08-21 16:22:52

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号