A method may include providing a geologic time data structure configured to bind objects of a reservoir model to geologic times; linking one of the reservoir model objects to one of the geologic times; generation of simulation results for the reservoir model; and, based at least in part on the geologic time data structure, generating at least some of the simulation results along a geologic time axis. Various other devices, systems, processes, etc. are also described.
展开▼