首页>
外国专利>
WASTE DISPOSAL METHOD IN WASTE DISPOSAL SITE AND EXCAVATION BODY
WASTE DISPOSAL METHOD IN WASTE DISPOSAL SITE AND EXCAVATION BODY
展开▼
机译:废物处置场和开挖主体中的废物处置方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a refuse disposal method that a non-discharge excavation hole (compaction hole) is formed by compacting excavated refuse to a hole wall and surface refuse and carried refuse are thrown into the compaction hole in a waste disposal site and by which refuse disposal can be performed even in the disposal site where the compaction hole cannot be kept in a landfill site and the like.;SOLUTION: An excavation body 1 connected with an excavation part 11 having an opening and closing puncture part 115 at the tip part of a casing 12a is used and a compaction hole A is formed by an excavation device 2 having an excavation mechanism 21 achieving rotational excavation while clutching the casing. Refuse C is thrown from the upper opening of the casing in a buried state of the excavation body 1, the excavation body (excavation part and the casing) is sequentially pulled out by opening the opening and closing puncture part 115 and then backfill filling the refuse in an excavation hole is performed.;COPYRIGHT: (C)2015,JPO&INPIT
展开▼