首页> 外国专利> Method for predicting contamination range of molten steel when changing ladle

Method for predicting contamination range of molten steel when changing ladle

机译:更换钢包时钢水污染范围的预测方法

摘要

Predicting a degree of molten steel contamination during ladle exchange includes setting a casting quantity (Q) and a residual quantity (Qrm). Casting quantity (Q) is the molten steel amount transferred from a tundish to a mold when a first ladle operation ends. Residual quantity (Qrm) is the molten steel amount existing in the tundish when a second ladle starts. Casting amount (Qplug), a first contaminant concentration is calculated as a function of Qrm and a proportional coefficient. Casting amount (Qpeak), the amount a second contaminant concentration, is calculated as a function of Qrm and a second proportional coefficient. A preliminary degree of contamination is a linear function of Q, Qplug, and Qpeak. A second preliminary degree of contamination is an exponential function of Q, Qplug, and Qpeak. The smaller of the two preliminary degrees of contamination is selected to obtain a degree of contamination at the ladle operation end and a second degree of contamination at the second ladle operation start.
机译:预测钢包交换过程中钢水的污染程度包括设置铸造量(Q)和残留量(Qrm)。铸造量(Q)是在第一钢包操作结束时从中间包转移到铸模的钢水量。残留量(Qrm)是第二个钢包启动时中间包中的钢水量。根据Qrm和比例系数计算铸造量(Qplug),第一污染物浓度。根据Qrm和第二比例系数计算铸造量(Qpeak),即第二污染物浓度的数量。初步的污染程度是Q,Qplug和Qpeak的线性函数。污染的第二个初步程度是Q,Qplug和Qpeak的指数函数。选择两个初步污染程度中的较小者,以在钢包操作结束时获得污染程度,并在第二个钢包操作开始时获得第二污染程度。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号