首页> 外国专利> Being the hot top in order

Being the hot top in order

机译:成为热门话题

摘要

PROBLEM TO BE SOLVED: To provide a hot-top for continuous casting and a method of continuous casting which enables injection which does not cause temperature unevenness in a continuous casting mold when molten metal is poured in the continuous casting mold from the hot-top.;SOLUTION: The molten metal introduced in an annular groove 14 is prevented from being poured from a molten metal flow down outlet 6 to the continuous casting mold 4 by a weir 16 between the annular groove 14 and the molten metal flow down outlet 6 at the start of introduction. Since the molten metal cooled down at this time flows down to a molten metal tank 20, temperature of the hot-top 2 for continuous casting, especially the weir 16 efficiently rises. After that, a molten metal surface level rises, overflows from the top 16a of the weir 16, and the molten metal flows down from the molten metal flow down outlet 6 along the inner peripheral shape of the continuous casting mold 4, the molten metal smoothly flows in the continuous casting mold 4 while maintaining sufficiently high temperature. Thus, the temperature unevenness is not caused in the continuous casting mold 4 when the molten metal is poured to the continuous casting mold 4 from the hot-top 2 for continuous casting, and a cylindrical ingot with sufficiently high quality is manufactured.;COPYRIGHT: (C)2011,JPO&INPIT
机译:解决的问题:提供一种用于连续铸造的热顶板和一种连续铸造的方法,该方法能够进行注射,当从热顶板将熔融金属倒入连续铸造模具中时,注射不会在连续铸造模具中引起温度不均匀。 ;解决方案:通过在环形槽14和熔融金属向下出口6之间的堰16,防止引入环形槽14中的熔融金属从熔融金属向下出口6倒入连铸模具4。开始介绍。由于此时被冷却的熔融金属向下流动至熔融金属罐20,因此用于连续铸造的热炉顶2,特别是堰16的温度有效地升高。之后,熔融金属表面高度上升,从堰16的顶部16a溢出,并且熔融金属沿着连续铸造模具4的内周形状从熔融金属流下出口6向下流动,熔融金属平稳地流动。在保持足够高的温度的同时在连续铸模4中流动。因此,当将熔融金属从用于连续铸造的热炉顶2倒入连续铸造模具4中时,不会在连续铸造模具4中引起温度不均匀,并且制造了具有足够高质量的圆柱形铸锭。 (C)2011,日本特许厅&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号