首页> 外国专利> EORICA Power Installation Tower consists of a upper and lower flange, a covering edge surface, and at least two longitudinal flanges connected to the covering edge surface, two adjacent sections of which are connected. In the middle, and the program manufacturing tower.

EORICA Power Installation Tower consists of a upper and lower flange, a covering edge surface, and at least two longitudinal flanges connected to the covering edge surface, two adjacent sections of which are connected. In the middle, and the program manufacturing tower.

机译:EORICA电力安装塔包括一个上下法兰,一个覆盖边缘表面以及至少两个连接到覆盖边缘表面的纵向法兰,两个相邻部分连接在一起。在中间,和程序制造塔。

摘要

Tower of Wind Power Plant, with a number of Tower Segments, in each case, have a top and Bottom Flange, wherein at least one presents two longitudinal flanges, where each Flange has a First longitudinal side to place on a First Side another Brid A longitudinal and a Second Side, the surface cover is welded.Where the second side is opposite the first Side; procedure.
机译:风力发电厂的塔架,分别具有多个塔架段,分别具有顶部和底部法兰,其中至少一个具有两个纵向法兰,其中每个法兰都有一个第一纵向侧面,并在第一侧面上放置另一个桥A纵向和第二侧,焊接表面覆盖层。第二侧与第一侧相对;程序。

著录项

相似文献

  • 专利
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号