A method for selective development of coal beds with goaf stowing includes working out coal bed with long production faces with cutting side rocks with stoping machines and delivery of empty rocks to worked out space. Delivery of rock to worked out space is carried out through reloading from the conveyor of the face to enameled pans preliminarily introduced and fixed in the upper section of mechanized support, and then in self-flow of rock in vibration mode. Decrease of energy consumption and labor consumption of stowing operations are achieved, with increase of effectiveness of work.
展开▼