首页> 外文期刊>Mine water and the environment >A Proposed Method of Coal Pillar Design, Goaf Filling, and Grouting of Steeply Inclined Coal Seams Under Water-Filled Strata
【24h】

A Proposed Method of Coal Pillar Design, Goaf Filling, and Grouting of Steeply Inclined Coal Seams Under Water-Filled Strata

机译:注水层下急倾斜煤层煤柱设计,采空区注浆及注浆的拟议方法

获取原文
获取原文并翻译 | 示例
       

摘要

The key to safely and efficiently mining steeply inclined coal seams under water-filled strata is to size barrier pillars appropriately and to control the structural integrity of the roof. We propose a method for goaf filling and grouting of steeply inclined coal seams and for appropriately sizing barrier and sectional coal pillars for mining in such conditions. Through theoretical analysis, an expression for a reasonable barrier pillar size was derived, based on the time span of mining, the hydraulic characteristics of the coal seam, the permeability characteristic of the grout in the goaf, and the water pressure. Based on the degree of saturation of the overlying strata and the mining conditions of the steeply inclined no. 48 coal seam of the Longhu mine in Qitaihe, China, we determined through theoretical analysis that the barrier pillar should be 80 m, the width of the sectional coal pillar should be 15 m, the length of the goaf filling should be 80 m, and the grouting length should be 40 m, to ensure safe production in that mine without geotechnical failures or injuries. These recommendations are being implemented.
机译:安全有效地在充水层下开采陡峭倾斜煤层的关键是适当地设置阻隔支柱的尺寸并控制顶板的结构完整性。我们提出了一种用于在陡峭倾斜的煤层中进行采空区注浆和注浆的方法,以及在这种情况下适当地确定障壁和分段煤柱尺寸的方法。通过理论分析,根据采矿时间跨度,煤层的水力特性,煤层中注浆的渗透性特性和水压,得出了合理的障壁尺寸的表达式。根据上覆岩层的饱和度和急倾斜斜面的开采条件。我们通过理论分析确定了中国七台河市龙湖煤矿48煤层的围护柱应为80 m,分段煤柱的宽度应为15 m,采空区充填长度应为80 m,并且注浆长度应为40 m,以确保在该矿井中安全生产而不会发生岩土工程故障或人身伤害。这些建议正在执行中。

著录项

  • 来源
    《Mine water and the environment》 |2015年第1期|87-94|共8页
  • 作者

    C. Y. Liu; J. X. Yang; F. F. Wu;

  • 作者单位

    State Key Laboratory of Coal Resources and Safe Mining, Key Laboratory of Deep Coal Resource Mining Ministry of Education, School of Mines, China Univ of Mining and Technology, Xuzhou 221116, Jiangsu, China;

    State Key Laboratory of Coal Resources and Safe Mining, Key Laboratory of Deep Coal Resource Mining Ministry of Education, School of Mines, China Univ of Mining and Technology, Xuzhou 221116, Jiangsu, China;

    State Key Laboratory of Coal Resources and Safe Mining, Key Laboratory of Deep Coal Resource Mining Ministry of Education, School of Mines, China Univ of Mining and Technology, Xuzhou 221116, Jiangsu, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Goaf grouting; Mining duration; Seepage time; Longhu mine;

    机译:采空区注浆;开采时间;渗透时间;龙湖矿;
  • 入库时间 2022-08-17 13:50:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号