首页> 外国专利> ANTI-FLOOD HYDRO-POWER CONSTRUCTION

ANTI-FLOOD HYDRO-POWER CONSTRUCTION

机译:防洪水电工程

摘要

An anti-flood hydro-power construction comprises a water reservoir located in the river basin, with lower operational reservoir filled with water from the upper river range at flood period and the upper dry reserve reservoir filled with water from the upper river range at low water period and the upper dry reserve reservoir filled with water from the upper range of the river at flood period, and hydro-power unit, this comprises a forebay and hydro-electric power plant with water discharge in the lower river range. The hydro-power unit comprises 2-4 insulated sections mounted in sequence and operating in parallel, each of those includes a separate forebay and a separate operating in parallel hydro-electric power plant, and the forebays are separated one from another with overflow walls with different heights and are arranged with possibility of filling those with water from water reservoir in sequence through overflow walls. The height of the overflow wall of the forebay adjoining the water reservoir corresponds to the water level in operation reservoir at low water period, and the height of the overflow wall of the forebay most far from the water reservoir corresponds to maximal water level in water reservoir at period of the most intensive flood.
机译:一种防洪水电建设,包括位于流域的水库,在洪水期,较低的运营水库充满上游河段的水,而较低的干水库则充满上游河段的水。洪灾时期,上游干储水库充满洪水期间河道上游的水,以及水力发电机组,包括前河和水力发电厂,下游河段排水。水力发电机组包括2-4个绝缘部分,这些绝缘部分按顺序安装并并行运行,每个绝缘部分都包括一个单独的前舱和一个并联运行的水力发电厂,并且前舱之间通过溢流壁彼此隔开。高度不同,并且可以通过溢流壁依次从储水罐中注满水。与水库相邻的前湾溢流壁的高度对应于低水期作业池中的水位,距水源最远的前湾溢流壁的高度对应于水库中的最大水位在最严重的洪水时期。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号